| Sl.No | Description of Items | Tender Reference No. | CPPP Tender ID No. | Bid Submission End date | Bid Opening date |
|---|---|---|---|---|---|
| 26 | Supply, lnstallation (including migration) & Training of campus wireless network Double Bid System |
A3(72455)2024lPU R/SERC Dt. 28-03-2025 | 2025_CSIR_231598_1 Dt.28-03-2025 | 24-04-2025 @2.00 PM | 25-04-2025 @2.30 PM |
| 27 | Supply, Installation, Configuration, Demonstration & Training of Hyper Converged Infrastructure Double Bid System |
A3(72396)2024/PUR/SERC Dt. 28-03-2025 | 2025_CSIR_231583_1 Dt.28-03-2025 | 24-04-2025 @2.00 PM | 25-04-2025 @2.30 PM |
| 28 | Supply, Installation, Commissioning, Training and Demonstration of “High Speed Camera” Single Bid System |
A3(72281)2024/PUR/SERC/VOL-II Dt. 07-03-2025 | 2025_CSIR_791494_1 Dt. 07-03-2025 | 10-04-2025 @2.00 PM | 11-04-2025 @2.30 PM |
| 29 | Filtration of transformers, OLTC and servicing of HT/LT switch gears in substations in CSIR-SERC, CSIR Campus, Taramani, Chennai – 113. |
50(59)/2024-2025/EW/SE Dt. 21-02-2025 | 2025_CSIR_227632_ 1 Dt. 21-02-2025 | 04-03-2025 @6.00PM | 06-03-2025 @11.00AM |
| 30 | Supply, Installation, Demonstration and Training of IR Thermal Imaging System |
A3(72441)2024/PUR/SERC Dt. 04-02-2025 | 2025_CSIR_225716_1 Dt. 04-02-2025 | 11-03-2025 @2.00 PM | 12-03-2025 @2.30 PM |
| 31 | Supply, Installation,Demonstration and Training of Single Stage Gas Gun Equipment |
A3(72434)2024/PUR/SERC Dt. 30-01-2025 | 2025_CSIR_225094_1 Dt. 30-01-2025 | 03-03-2025 @2.00 PM | 04-03-2025 @2.30 PM |
| 32 | Repairing / Retrofitting work for RCC base floor and wall of basement of Special and Multifunctional Structures lab, (SMSL) building at CSIR-SERC, Taramani, Chennai – 600113. |
50(45)/2022-2023/CW/SE Dt. 30-01-2025 | 2025_CSIR_ 225257_ 1 Dt. 30-01-2025 | 12-02-2025 @6.00PM | 14-02-2025 @11.00AM |
| 33 | Renovation of Essential staff accommodation Type III & IV quarters (both Civil & Electrical works) in TTRS, Thirusulam, Chennai – 600 043. |
622(127)/2024-2025/CW/EW/SE Dt. 27-01-2025 | 2025_CSIR_ 224941_ 1 Dt. 27-01-2025 | 08-02-2025 @6.00PM | 10-02-2025 @11.00AM |
| 34 | Construction of RCC compound wall in TTRS-SERC campus at Thirusulam, CSIR-SERC, Chennai- 600043 |
50(51)/2024-2025/CW/SE/TTRS Dt. 13-01-2025 | 2025_CSIR_ 211990_ 1 Dt. 13-01-2025 | 21-01-2025 @6.00PM | |
| 35 | Supply, Installation, Commissioning & Training of Oil Chiller Unit for Moog Hydraulic Power Packs as per Annexure- A& B enclosed in Chapter-4 |
A3(72380)2024/PUR/SERC Dt. 06-01-2025 | 2024_CSIR_212161_1 Dt. 06-01-2025 | 05-02-2025 @2.30 PM | 06-02-2025 @3.00 PM |
| 36 | Replacement of false ceiling and Electrical fittings at Wind Engineering Laboratory and replacement of electrical fittings at ACTEL in CSIR-SERC, CSIR Campus, Taramani, Chennai – 113. |
50(58)/2024-2025/CW/EW/SE Dt. 03-01-2025 | 2025_CSIR_ 222549_ 1 Dt. 03-01-2025 | 18-01-2025 @6.00PM | 20-01-2025 @11.00AM |
| 37 | Fabrication, Supply and Installation of a Special Temporary Volumetric Pod as per Annexure ‘A’ & ‘B’ enclosed in Chapter-4 |
A3(12501)2024/PUR/SERC Dt. 20-12-2024 | 2024_CSIR_220564_1 Dt. 20-12-2024 | 21-01-2025 @2.30 PM | 22-01-2025 @3.00 PM |
| 38 | Security Services viz. “Regulation of Movement of Men, Material and Vehicles at the Entry and Exit Points of the Institute and Guarding of All Installations at Tower Testing & Research Station Campus, Tirusoolam, Chennai” |
A2(1575)/2022/GL Dt. 17-12-2024 | GEM/2024/B/5717127 | 07-01-2025 @14.00 | 07-01-2025 @14.30 |
| 39 | Supply and Installation of Mortar Mixing Machine. |
A3(72365)2024/PUR/SERC Dt. 13-12-2024 | 2024_CSIR_219313_1 Dt. 13-12-2024 | 09-01-2025 @2.30 PM | 10-01-2025 @3.00 PM |
| 40 | Supply, Installation, Commissioning & Training of Portable Ground Penetrating Radar. |
A3(72414)2024/PUR/SERC Dt. 12-12-2024 | 2024_CSIR_219150_1 Dt. 12-12-2024 | 08-01-2025 @2.30 PM | 09-01-2025 @3.00 PM |
| 41 | Providing access (ladders) for overhead water tank in various buildings in CSIR-SERC, CSIR Campus, Taramani, Chennai – 600 113. |
50(53)/2024-2025/CW/SE Dt. 13-12-2024 | 2024_CSIR_ 219315 _1 Dt. 13-12-2024 | 24-12-2024 @6.00PM | 26-12-2024 @11.00AM |
| 42 | Supply, Installation, Commissioning & Training of Ultrasonic Pulse Velocity Testing Equipment for Concrete Application with all Necessary Accessories. |
A3(72399)2024/PUR/SERC Dt. 11-12-2024 | 2024_CSIR_218951_1 Dt. 11-12-2024 | 06-01-2025 @2.30 PM | 07-01-2025 @3.00 PM |
| 43 | Replacement of damaged PVC pipes with CPVC pipes in KRD & Main Building in CSIR-SERC, CSIR Campus, Taramani, Chennai – 600 113. |
50(57)/2024-2025/CW/SE Dt. 11-12-2024 | 2024_CSIR_ 218978 _1 Dt. 11-12-2024 | 21-12-2024 @6.00PM | 23-12-2024 @11.00AM |
| 44 | Providing light point & raw power point and Energy efficient fitting at KRD and SSL in CSIR - SERC, CSIR Campus, Taramani, Chennai – 113. |
401(29)/2024-2025/CW/SE Dt. 21-11-2024 | 2024_CSIR_ 215603 _1 Dt : 21.11.2024 | 02-12-2024 @6.00PM | 04-12-2024 @11.00AM |
| 45 | Construction of plinth protection around the Auditorium building in CSIR-SERC, CSIR Campus, Taramani, Chennai – 600 113. |
50(54)/2024-2025/CW/SE Dt. 13-11-2024 | 2024_CSIR_214368_1 Dt. 13-11-2024 | 25-11-2024 @6.00PM | 27-11-2024 @11.00AM |
| 46 | Repair of damaged windows and repainting of substation and generator room in TTRS, Thirusulam campus, Chennai – 600 043. |
402(26)/2024-2025/CW/SE Dt. 05-11-2024 | 2024_CSIR_213476_1 Dt. 05-11-2024 | 16-11-2024 @6.00PM | 18-11-2024 @11.00AM |
| 47 | Repair and renovation of cladding system in Director’s office annexure building (First floor) in CSIR - SERC, Taramani, Chennai – 600 113. |
50(55)/2024-2025/CW/SE Dt. 05-11-2024 | 2024_CSIR_213465_1 Dt. 05-11-2024 | 16-11-2024 @6.00PM | 18-11-2024 @11.00AM |
| 48 | Supply, Installation & Commissioning of Oil Chiller Unit for Moog Hydraulic Power Pack). |
A3(72380)2024/PUR/SERC Dt. 22-10-2024 | 2024_CSIR_212161_1 Dt. 22-10-2024 |
22-10-2024 @6.00 PM Extended to 05-12-2024 @2.30 PM |
27-11-2024 @2.30 PM Extended to 05-12-2024 @3.00 PM |
| 49 | Renovation of Space grid structures near ACTEL building and bike parking behind the KRD building (both Civil and Electrical works) in CSIR-SERC, Taramani, Chennai – 600 113. |
50(56)/2024-2025/CW/EW/SE Dt. 21-10-2024 | 2024_CSIR_212008_1 Dt. 21-10-2024 | 04-11-2024 @6.00PM | 06-11-2024 @11.00AM |
| 50 | Construction of RCC Compound wall in TTRS-SERC campus, at Thirusulam, CSIR-SERC, Chennai – 600 043. |
50(51)/2024-2025/CW/SE Dt. 21-10-2024 | 2024_CSIR_211990_1 Dt. 21-10-2024 | 04-11-2024 @6.00PM | 06-11-2024 @11.00AM |